Skip to content
Redelvia
PlatformTRACEFor AirlinesFor ConsultantsResourcesSecurityAboutContact
Sign inRequest a demo
Redelvia

Aircraft redelivery execution for airlines, lessors and transition teams.

contact@redelvia.comRequest a demo

Product

PlatformRedelvia TRACEAirlinesConsultantsSecurity

Company

AboutResourcesGlossaryFree pilotContact

Legal

PrivacyTermsCookie Notice
© 2026 Redelvia
Aircraft Redelivery Execution Platform
Help us improve Redelvia

With your permission, anonymous usage measurements help us improve the public website. Form and customer data are excluded.

  1. Home
  2. Resources
  3. Managing redelivery findings and the open items list (OIL)

Guide · 2 min read

Managing redelivery findings and the open items list (OIL)

By Redelvia · Published 1 October 2026 · Updated 13 November 2026

Every records audit and inspection produces findings. Whether the aircraft goes back on time depends on how quickly those findings are triaged, owned, closed and agreed with the lessor.

Where findings come from

  • Records audits by the lessor or its technical representative.
  • Physical inspections, including borescope inspections and the final walk-around.
  • The demonstration flight and ground checks.
  • The operator's own review before the return.

What each finding needs

  • A clear description and the requirement or return condition it affects.
  • A category, records or physical, and a severity.
  • An owner and a due date that fits the return schedule.
  • The planned treatment: rectify, provide evidence, defer by agreement or compensate.
  • Closure evidence the lessor can verify.
  • An exposure estimate when the finding may cost time or money.

Running the list day to day

  • Triage new findings quickly while inspections are under way.
  • Escalate findings that threaten the return date or the budget.
  • Keep the lessor's position next to the finding itself, not in a separate email thread.
  • Close a finding only when its evidence has been accepted.

Measuring progress

  • Open findings by severity and by owner.
  • Findings past their due date.
  • Findings waiting for the lessor's position.
  • Estimated exposure that is still open.
  • Findings closed in the last week, to show the trend.

Agreeing findings with the lessor

Some findings are rectified, others are closed with documents and some are settled commercially. Whatever the route, record who agreed it and when: the open items that remain, and how they will be treated, often form part of the final acceptance.

Worked example: a closed task with an open acceptance point

Fictional example: a technician completes a cabin rectification and uploads photographs. The task may be complete, while the linked finding still needs its closure summary and evidence check. The lease requirement may then need a separate lessor submission.

Track those three decisions separately: action completed, finding closed with its supporting record, and requirement accepted by the lessor. This prevents an internally completed action from disappearing from the outstanding acceptance work.

Redelivery open items list (OIL) template (Excel)

Ten example open items from a records audit and a joint inspection, with severity, owner, due date, closure evidence and the lessor's position. Days open and overdue items are calculated, and a summary sheet counts the items by severity, status and lessor position.

Download the Excel template

How Redelvia helps

In Redelvia, each finding carries its severity, owner, due date, linked tasks, closure evidence and exposure; MRO participants work only on the findings shared with them, and readiness shows which open items still block the return.

Explore the platform · Request a free pilot (6 to 12 months)

Sources and scope

Prepared by Redelvia. These references cover the industry and regulatory context. The workflow examples are our own illustrations; your lease and the applicable authority determine the requirements for your aircraft.

  • IATA — Aircraft Leasing Policy & Standards

    Access to IATA's aircraft lease guidance, including delivery and redelivery preparation. Use the agreed lease to establish the conditions for your aircraft.

Key terms in this guide

  • Finding
  • Open items list (OIL)
  • Closure evidence
  • Exposure
  • Joint inspection
  • Borescope inspection
  • Non-routine card (NRC)
  • Deferred defect
  • Lessor technical representative

Browse the full glossary

Related guides

  • Aircraft redelivery checklist: what to control before a lease return
  • Aircraft redelivery timeline: a T-minus plan from 24 months out to handback
  • Lease return conditions: how to turn the lease into a requirement matrix
  • Back-to-birth records and LLP traceability at aircraft redelivery

Walk through your next aircraft return.

See how a lease requirement moves through evidence, rectification and lessor review. Then evaluate Redelvia on your own aircraft during a free pilot of 6 to 12 months.

Request a demo